Pure Pharma AG - <em>CarbonActive</em> Reference
Customer testimonial - Pure Pharma AG

Pharma meets purity.

GMP-compliant ventilation infrastructure for the new packaging and production facility in Laufenburg: two separate concepts for ISO and GMP zones, a continuous filter cascade from F7 to F9 to H13 - planned, built and commissioned from a single source.

ProjectGMP conversion Laufenburg
LocationLaufenburg - 🇨🇭
StandardEU-GMP
CommissioningJanuary 2024
"
What helped us in particular: CarbonActive paid attention early on to what would be expensive later.
Andreas Fäh
Andreas Fäh Project Management - Pure Pharma AG - Switzerland
A portrait of Pure Pharma

A look behind the scenes.

Before we dive deep into filter classes and pressure cascades, let's take a look at the company for which we planned and built the GMP infrastructure in Laufenburg. Pure Pharma stands for medicinal cannabis products with pharmaceutical standards.

Facts, figures and data

The project at a glance.

01 / Filter cascade
F7 - F9 - H13
Three-stage filtration - pre-filter to HEPA particulate air filter
02 / Facilities
2separatesystems
Independent ventilation for production and packaging - both ISO & GMP-compliant
03 / Delivery time
10weeks
Lead time for critical components - early procurement was mandatory
04 / Project duration
Oct 23 → Jan 24
From the inventory to GMP-compliant commissioning
Scheme

This is how the filter cascade works.

In a GMP-compliant facility, outside air is not introduced directly - it passes through a three-stage cleaning cascade. Each variant removes finer particles before the air enters the GMP zone. The end result: HEPA-level particulate filtration, documented and certifiable.

AUSSEN- LUFT unbehandelt F7 VORFILTER ePM2.5 ≥ 65 % grobe Partikel · Pollen F9 FEINFILTER ePM1 ≥ 80 % Sub­mikron · Aerosole H13 · HEPA SCHWEBSTOFF ≥ 99,95 % @ MPPS Bakterien · Viren GMP-ZONE Verpackung · Produktion VERPACKUNGS­LINIE Δp +30 Pa · ISO 8 ÜBERDRUCK +30 Pa CARBONACTIVE · STEUERUNG ●Δp · Volumenstrom · Filterüberwachung AUSSENLUFT unbehandelt F7 VORFILTER ePM2.5 ≥ 65 % F9 FEINFILTER ePM1 ≥ 80 % H13 · HEPA SCHWEBSTOFF ≥ 99,95 % @ MPPS ÜBERDRUCK +30 Pa GMP-ZONE Verpackung · Produktion VERPACKUNGSLINIE ISO 8 CARBONACTIVE ●STEUERUNG · Δp · Filter
F7Pre-filter- coarse particles
F9Fine filter- submicron
H13HEPA- HEPA filter
Ultra-pure air (in GMP zone)
Sensors & control systems
Pressure cascades

From corridor to clean room.

The pressure values shown are exemplary - the exact design parameters are subject to the trade secrets of Pure Pharma AG.
AUSSEN / KORRIDOR 0 Pa PERSONAL­SCHLEUSE +15 Pa Eingangs­zone F7-Filterstufe GMP-KLASSE D +30 Pa Verpackung Vor­stufe · ≈ ISO 8 F7 + F9 max. 3.520.000 /m³ Partikel ≥ 0,5 µm · in Ruhe GMP-KLASSE C +45 Pa Produktion · Verpackung · ≈ ISO 7 F7 + F9 + H13 max. 352.000 /m³ Partikel ≥ 0,5 µm · in Ruhe REINSTLUFT Δp = 0 Δp = +45 Pa · GMP Klasse C AUSSEN / KORRIDOR 0 Pa PERSONALSCHLEUSE +15 Pa Eingangszone F7-Filterstufe GMP-KLASSE D +30 Pa Verpackung Vorstufe · ≈ ISO 8 F7 + F9 max. 3.520.000 /m³ Partikel ≥ 0,5 µm · in Ruhe GMP-KLASSE C +45 Pa Produktion · Verpackung · ≈ ISO 7 F7 + F9 + H13 max. 352.000 /m³ Partikel ≥ 0,5 µm · in Ruhe REINSTLUFT LUFTSTROM ↑ · CLEAN-TO-DIRTY
01 / Print

+45 Pa overpressure

The GMP zone is under constant overpressure - air only flows outwards. Particles from outside have no chance.

0 → +45 Pa - four variant cascade
02 / Purity

GMP classes C + D

Filter combination F7 - F9 - H13 achieves suspended matter separation > 99.95 % - certifiable according to EU-GMP (≈ ISO 7 / ISO 8).

99,95 % @ MPPS - H13 HEPA
The story

In three acts.

01 / Initial situation

Pharma needs purity.

Pure Pharma modernized its site in Laufenburg in 2023 to raise the packaging and processing of flowers products to pharmaceutical standards - ISO and GMP. A complete concept from a single source was required.

02 / Challenge

Certifiable. Time-critical.

Two separate ventilation systems, GMP documentation requirements, conversion during ongoing production - and delivery times of up to ten weeks for critical components. Without early basic planning, it would have been significantly more expensive.

ISO 8 EU-GMP F7 - F9 - H13 Pressure cascades Weekly reporting
03 / Result

GMP-capable. Modular.

Completely individually planned ventilation facility, modular in design, maintenance-friendly and retrofittable. CarbonActive took care of everything from the initial assessment to commissioning - on a management basis, transparently and at eye level.

Your GMP processing zone.
We plan it.

From inventory to commissioning - CarbonActive plans, builds and operates ventilation infrastructure for GMP-compliant pharmaceutical and cannabis production. 🇨🇭