Industrial precision on 1,400 m².
One of the largest and most technically demanding indoor projects we have ever realized: a completely closed climate control system with active cooling, dehumidification and CO₂ management - planned for maximum production stability with minimum energy consumption.
In projects of this size, it's not the technology that counts - it's the planning behind it.
The whole statement.
This project is one of the largest and most technically demanding facilities we have ever realized.
The challenge lay not only in the dimensions of over 1,400 m² net cultivation area, but above all in the framework conditions: a completely closed system, high demands on dehumidification and CO₂ management as well as the request to achieve maximum production stability with the most efficient use of energy possible.
Our experience clearly shows that a well thought-out structure can save over 35% of total and operating costs - and at the same time massively increase production reliability.
In this project, we deliberately opted for a purely closed system with active cooling and dehumidification - combined with precise control systems for all climatic parameters. The focus was on:
- stable, reproducible conditions
- Minimal fluctuations in the room climate
- a long-lasting, economical mode of operation
Such facilities only work if all trades - from planning and construction to commissioning - are precisely matched to each other. This project is an example of what is possible when engineering, experience and structure are consistently brought together.
The project at a glance.
This is how the closed system works.
The centerpiece: an Air Handling Unit (AHU), in which the room air is treated on a modular basis. The pre-filter and motor prepare the air flow - the cooler lowers the temperature below the dew point so that moisture condenses out (dehumidification in one step). The reheater then brings the air precisely to the target temperature and CO₂ is dosed in the last module. A central control system regulates all parameters every second.
In three acts.
Maximum scale. Maximum claim.
Over 1,400 m² net cultivation area, embedded in a regulatory framework, with the requirement for complete climate control with minimal energy consumption. A task that does not work without proper preliminary planning.
Stability under any load.
Closed system, high dehumidification performance, precise CO₂ management - all with the lowest possible power consumption. Each trade had to be precisely coordinated with the next, from planning and construction to commissioning.
One system. Industrial scale.
Low-fluctuation climate, reproducible production cycles and over 35 % savings in total and operating costs. A facility that shows what is possible when engineering, experience and structure are consistently combined.
From the facility .
Impressions from the project - from the empty warehouse to the fully productive facility. Navigate through the gallery with arrows or dots.
01 - Construction phase
02 - Removal & installation
03 - Air conditioning
04 - Facility in operation
05 - Production plant
06 - Full load
07 - Close-up
Your project.
We plan it.
From the initial concept to commissioning - CarbonActive plans, builds and operates high-end climate infrastructure for industrial indoor production. 🇨🇭